Overhead cranes—often called bridge cranes—are the quiet workhorses that keep heavy industry moving. This practical guide follows the journey from bare runways to a commissioned crane ready for service. We’ll cover rails and runway alignment—with the same checklists pro installers use.
Bridge Crane Basics
At heart, a bridge crane is a bridge beam that spans between two runway beams, with a trolley that travels left-right along the bridge and a hoist that lifts the load. The result is smooth X-Y-Z motion: long-travel along the runway.
You’ll find them in fabrication bays, steel plants, power stations, oil & gas shops, precast yards, and logistics hubs.
Why they matter:
Controlled moves for large, expensive equipment.
Huge efficiency gains.
Lower risk during rigging, lifting, and transport inside facilities.
High throughput with fewer ground obstructions.
What This Install Includes
Runways & rails: continuous beams and rail caps.
End trucks: wheel assemblies that ride the rail.
Bridge girder(s): cambered and pre-wired.
Trolley & hoist: cross-travel carriage with lifting unit.
Electrics & controls: VFDs, radio remote, pendant.
Stops, bumpers & safety: end stops, buffers, travel limits.
Based on design loads and bay geometry, the crane might be a single-girder 10-ton unit or a massive double-girder 100-ton system. The choreography is similar, with heavier rigs demanding extra controls and sign-offs.
Pre-Install Prep
A clean install is mostly planning. Key steps:
Drawings & submittals: Approve general arrangement (GA), electrical schematics, and loads to the structure.
Permits/JSAs: Permit-to-work, hot work, working at height, rigging plans.
Runway verification: Check legacy building baseplates, grout pads, and anchor torque.
Power readiness: Lockout/tagout plan for energization.
Staging & laydown: Mark crane components with ID tags.
People & roles: Appoint a lift director, rigger, signaler, and electrical lead.
Millimeters at the runway become centimeters at full span. Spend time here.
Rails & Runways
If rails are off, nothing else will run true. Targets and checks:
Straightness & elevation: shim packs under clips to meet tolerance.
Gauge (span) & squareness: Check centerlines at intervals; confirm end squareness and expansion joints.
End stops & buffers: Verify clearances for bumpers at both ends.
Conductor system: Keep dropper spacing uniform; ensure collector shoe reach.
Record as-built readings. Misalignment shows up as crab angle and hot gearboxes—don’t accept it.
Lifting the Bridge
Rigging plan: Choose spreader bars to keep slings clear of electricals. Taglines for swing control.
Sequence:
Lift end trucks to runway level and set temporarily on blocks.
For double-girder cranes, lift both girders with a matched raise.
Use drift pins to align flange holes; torque to spec.
Verify camber and bridge square.
Prior to trolley install, bump-test long-travel motors with temporary power (under permit): confirm limit switch wiring. Re-apply LOTO once checks pass.
The Heart of the Lift
Trolley installation: Hoist/trolley arrives pre-assembled or as modules.
Hoist reeving: Lubricate wire rope; verify dead-end terminations.
Limits & load devices: Set upper/lower limit switches.
Cross-travel adjustment: Align trolley rails on a double-girder.
Pendant/remote: Install pendant festoon or pair radio receiver; function-test deadman and two-step speed controls.
A smooth trolley with a quiet hoist is a sign of good alignment. Fix the mechanics first.
Power with Discipline
Power supply: Drop leads tagged and strain-relieved.
Drive setup: Program VFDs for soft starts, decel ramps, and brake timing.
Interlocks & safety: E-stops, limit switches, anti-collision (if multiple cranes), horn, beacon.
Cable management: Secure junction boxes; label everything for maintenance.
Commissioning crews love clean labeling and clear folders. Photos of terminations help later troubleshooting.
Trust but Verify
Inspection Test Plan (ITP): Third-party witness for critical steps.
Torque logs: Re-check after 24 hours if required.
Level & gauge reports: Note any corrective shims.
Motor rotation & phasing: Document bump tests.
Functional tests: Anti-collisions and zone interlocks.
A tidy databook speeds client acceptance.
Load Testing & Commissioning
Static load test: Apply test weights at the hook (usually 100–125% of rated capacity per spec).
Dynamic load test: Check sway, braking distances, and VFD fault logs.
Operational checks: Limit switches trigger reliably; overload trips; horn/beacon function.
Training & handover: Operator basics, daily pre-use checks, rigging do’s & don’ts.
Only after these pass do you hand over the keys.
Everyday Heavy Lifting
Construction & steel erection: handling long members safely.
Oil & gas & power: generator and turbine assembly.
Steel mills & foundries: hot metal handling (with the right duty class).
Warehousing & logistics: bulk material moves with minimal floor traffic.
Floor stays clear, production keeps flowing, and precision goes up.
Do It Safe or Don’t Do It
Rigging discipline: dedicated signaler and stop-work authority.
Lockout/Tagout: clear isolation points for electrical work.
Fall protection & edges: approved anchor points, guardrails on platforms, toe boards.
Runway integrity: regular runway inspection plan.
Duty class selection: match crane class to cycles and loads.
Safety isn’t a stage—it's the whole show.
If It Doesn’t Run Smooth
Crab angle/drift: verify end-truck wheel diameters and gearbox mounts.
Hot gearboxes: adjust brake air gap and reduce VFD decel.
Rope drum spooling: dress rope and reset lower limit.
Pendant lag or dropout: antenna placement for radio; inspect festoon collectors.
Wheel wear & rail pitting: lubrication and alignment issues.
A 10-minute weekly check saves days of downtime later.
FAQ Snippets
Overhead vs. gantry? Choose per site constraints.
Single vs. double girder? Singles are lighter and cheaper; doubles carry heavier loads and give more hook height.
How long does install take? Anything from a couple weeks to a few months.
What’s the duty class? FEM/ISO or CMAA classes define cycles and service—don’t guess; size it right.
Who Gets the Most Value
If you’re a civil or mechanical engineer, construction manager, shop supervisor, or just a mega-project fan, this deep dive makes the whole process tangible. You’ll gain a checklist mindset that keeps cranes safe and productive.
Need a field bundle with JSA templates, rigging calculators, and commissioning sheets?
Get the toolkit now so your next crane goes in cleaner, faster, and right the first time. Save it to your site tablet for quick reference.
...